Field Data Collection

Water Pipeline Setting-Out & Construction Support

Field setting-out, level control and site documentation for urban water pipeline installation, including Bill of Quantities support.

Role
Assistant Surveyor (Field)
Period
2024 – 2025
Location
Nairobi, Kenya
  • GNSS
  • Digital Level
  • AutoCAD Civil 3D
Water pipeline being laid in a trench during construction

The work

Day-to-day field survey support on urban water pipeline installation — translating approved drawings into accurate, buildable positions on the ground.

My contribution

  • Set accurate levels with a digital level to guide trench excavation and pipe installation, improving installation precision.
  • Interpreted and implemented pipeline layout plans, keeping the engineering and site teams aligned.
  • Supported preparation and implementation of the Bill of Quantities (BOQ) for accurate material estimation and cost control.
  • Led site reporting and archiving, documenting completed works against the project scope for tracking, accountability and clean handover.

Result

Pipeline installed to correct alignment and gradient, with a complete, traceable record of works supporting smooth client handover.

Gallery

Pipeline laying in a trench
Pipeline laying and alignment on site.
Pipe jointing works
Pipe jointing and inspection.
Excavation and setting out
Excavation following the set-out centreline.
Backfilling and reinstatement
Backfilling and reinstatement.