The work
Day-to-day field survey support on urban water pipeline installation — translating approved drawings into accurate, buildable positions on the ground.
My contribution
- Set accurate levels with a digital level to guide trench excavation and pipe installation, improving installation precision.
- Interpreted and implemented pipeline layout plans, keeping the engineering and site teams aligned.
- Supported preparation and implementation of the Bill of Quantities (BOQ) for accurate material estimation and cost control.
- Led site reporting and archiving, documenting completed works against the project scope for tracking, accountability and clean handover.
Result
Pipeline installed to correct alignment and gradient, with a complete, traceable record of works supporting smooth client handover.